Old Foundations Removed for New Construction

Demolition in Fort Kent for removing older structures and concrete footings before a new foundation is built

Older houses and outbuildings in the valley towns are often built on stone or old concrete foundations that have to be broken out and removed before a new foundation can go in, and the existing footing tells you a lot about what the new one needs to match in depth, width and drainage. The owner evaluates what is being removed, plans the sequence, and handles the excavation and hauling so the site is left ready for new construction, walking the structure before any cutting or breaking starts to identify what is load-bearing, what is buried, and where utilities run.


Utilities are disconnected before any demolition equipment is brought to the site, and the building is taken down in sections so debris can be sorted and hauled as the work progresses. Concrete is broken out with hydraulic breakers mounted on the excavator, rebar is cut and separated, and the footing is removed down to undisturbed soil so the new foundation can be excavated from a clean, stable surface. Material is either hauled off site or staged for disposal depending on the project timeline and the availability of a debris pile location.


Arrange a free estimate to review the demolition sequence and confirm what is included in the quote.

What the Demolition Process Requires

The owner walks the structure with you before any work begins, identifying utility connections, buried tanks or lines, and any materials that require special handling or disposal, so the demolition is planned to avoid damage to adjacent structures or underground infrastructure. The excavator is used to pull framing, break concrete, and load debris, and the site is graded to rough elevation once all material is removed and the area is cleared.


After demolition is complete, you will see a cleared lot with no remaining foundation, debris or buried material inside the new building footprint, and the ground graded roughly level so the excavator that digs the new foundation starts from a clean surface. The old footing is gone, utilities are capped or rerouted, and the site is ready for layout and excavation.


The quote should clarify whether hauling, disposal fees and final grading are included, since those items depend on the volume of material removed, the distance to the disposal site, and whether the debris can be sorted for recycling or must be landfilled as mixed waste.

Answers About How the Work Is Done

Demolition projects in Presque Isle and Winterville raise specific questions about how old foundations and structures are removed, what happens to the material, and how the site is prepared for the new foundation that follows.

  • What is identified during the pre-demolition walkthrough?

    The owner checks for utility connections, load-bearing walls or posts, buried fuel tanks, septic systems, and any asbestos or hazardous materials that require abatement before demolition can proceed, so the work is sequenced safely and in compliance with local regulations.

  • How is old concrete broken out and removed?

    Hydraulic breakers mounted on the excavator are used to fracture the concrete into manageable pieces, rebar is cut with shears or torches, and the broken material is loaded into trucks for hauling or staged on site if a debris pile is allowed.

  • Why are utilities disconnected before demolition starts?

    Active electrical, gas or water lines can be damaged during demolition, creating safety hazards or service interruptions, so all utilities are shut off at the source and capped or rerouted before any structural work begins.

  • What happens to the material after it is removed?

    Concrete and masonry are typically hauled to a crushing facility for recycling, wood framing is sorted and either salvaged or sent to a landfill, and metal is separated for scrap, though disposal options depend on local facility availability and the condition of the material.

  • How is the site graded after the old foundation is gone?

    The excavation is backfilled to rough grade, compacted to prevent settling, and leveled so the new foundation excavator has a stable working surface and the building pad drains correctly before any layout or digging begins.

Westfall Construction is a licensed and insured owner-operator offering free estimates, and the owner runs the demolition equipment personally. The company also handles demolition in Van Buren, Caribou, Presque Isle, Allagash and Eagle Lake.